This bike was the pinnacle of our second year as a club. The Fall 23 semester involved a month working on industrial design and 2 months in CAD. The second semester involved a manufacturing frenzy (including a few last minute design changes). Huge shout out to FSA, we WOULD NOT HAVE been able to finish the build without their incredibly generous parts donation.
When starting the club during Fall 2021, we outlined a two year plan to build a composite full suspension mtb. It's a pretty incredible feeling to work on something for two solid years and have it go according to plan. That's not to say it was easy, it wasn't. This project literally involved blood, sweat, and tears.

Co-Lead, manufacturing guru, test rider

Co-Lead, frame design

Dropout design and mfg

Manufacturing, assembly

Frame

Peripherals design and mfg

Dropout design and mfg